file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c3971.txt date: 31-Oct-2003 nobs = 2679, ngood = 2679, record length (days) = 111.63 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= 0.485, x trend= 0 var(x)= 109.7276 var(xp)= 62.1779 var(xres)= 47.5863 percent var predicted/var original= 56.7 % y0= 0.786, x trend= 0 var(y)= 99.8819 var(yp)= 4.8696 var(yres)= 95.1742 percent var predicted/var original= 4.9 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 3.297 3.419 -1.739 2.36 80.02 50.54 179.05 96.04 0.93 MSF 0.0028219 0.656 2.902 -0.148 2.13 148.14 66.85 21.49 206.73 0.051 ALP1 0.0343966 0.405 0.709 0.134 0.54 94.02 87.25 238.06 138.06 0.33 2Q1 0.0357064 0.367 0.685 -0.019 0.57 168.49 138.98 96.99 116.26 0.29 Q1 0.0372185 0.172 0.619 0.102 0.60 141.93 117.53 92.96 164.34 0.077 O1 0.0387307 1.140 0.824 -0.599 0.82 22.39 78.91 218.17 62.29 1.9 NO1 0.0402686 1.594 1.510 -0.521 1.67 1.91 104.07 211.53 71.63 1.1 *K1 0.0417807 1.546 0.796 -0.978 0.69 128.21 56.29 67.49 64.01 3.8 J1 0.0432929 0.607 0.683 -0.253 0.59 110.53 72.46 49.45 107.64 0.79 OO1 0.0448308 1.304 1.106 -0.418 1.21 159.95 75.91 188.61 69.78 1.4 UPS1 0.0463430 0.890 0.937 -0.742 0.88 46.75 122.40 159.21 123.62 0.9 EPS2 0.0761773 0.389 0.613 0.009 0.57 72.41 91.95 81.14 139.19 0.4 MU2 0.0776895 0.835 0.721 -0.579 0.60 103.21 90.47 9.96 97.91 1.3 *N2 0.0789992 2.682 0.725 0.310 0.88 178.94 20.28 169.66 16.51 14 *M2 0.0805114 10.706 0.782 -0.880 1.02 13.46 5.63 119.73 4.11 1.9e+002 L2 0.0820236 0.576 0.562 -0.309 0.54 165.50 94.47 70.73 94.96 1.1 *S2 0.0833333 1.955 0.726 0.076 1.00 17.99 25.87 112.18 23.63 7.2 ETA2 0.0850736 0.160 0.661 -0.123 0.60 178.44 149.18 148.95 184.64 0.058 MO3 0.1192421 0.157 0.250 0.047 0.25 89.95 76.33 76.71 133.47 0.39 M3 0.1207671 0.279 0.236 -0.009 0.25 127.22 64.98 217.79 73.92 1.4 MK3 0.1222921 0.225 0.303 -0.093 0.22 85.57 59.99 43.49 92.78 0.55 SK3 0.1251141 0.255 0.281 -0.142 0.25 53.15 79.08 197.54 92.94 0.83 MN4 0.1595106 0.192 0.207 -0.021 0.19 10.62 75.11 178.63 68.21 0.86 *M4 0.1610228 0.672 0.196 -0.417 0.20 7.49 35.78 339.48 34.59 12 SN4 0.1623326 0.124 0.164 -0.010 0.17 5.97 88.39 200.87 106.37 0.57 *MS4 0.1638447 0.298 0.186 -0.208 0.17 25.29 85.81 8.24 94.89 2.6 S4 0.1666667 0.169 0.187 -0.070 0.18 107.29 85.34 336.71 96.54 0.81 2MK5 0.2028035 0.094 0.120 0.046 0.11 34.59 117.39 343.45 129.99 0.61 2SK5 0.2084474 0.069 0.130 -0.057 0.14 34.63 121.32 137.90 166.34 0.29 *2MN6 0.2400221 0.215 0.126 -0.001 0.13 59.44 32.43 344.41 32.25 2.9 *M6 0.2415342 0.508 0.117 0.055 0.12 47.80 14.81 129.48 14.21 19 *2MS6 0.2443561 0.176 0.098 -0.016 0.10 54.96 47.76 139.69 47.63 3.2 2SM6 0.2471781 0.102 0.106 -0.059 0.11 8.23 100.08 109.02 111.37 0.94 3MK7 0.2833149 0.067 0.081 -0.012 0.08 56.76 77.68 357.05 92.39 0.69 M8 0.3220456 0.076 0.067 0.022 0.06 3.00 52.60 14.94 60.67 1.3 total var= 209.6095 pred var= 67.0475 percent total var predicted/var original= 32.0 %