file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c4592.txt date: 31-Oct-2003 nobs = 2517, ngood = 2517, record length (days) = 104.88 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= 0.922, x trend= 0 var(x)= 158.2416 var(xp)= 114.6878 var(xres)= 43.0081 percent var predicted/var original= 72.5 % y0= -0.0324, x trend= 0 var(y)= 18.4231 var(yp)= 1.2092 var(yres)= 17.2313 percent var predicted/var original= 6.6 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 0.701 1.198 0.095 1.02 125.60 107.92 213.04 146.21 0.34 MSF 0.0028219 1.701 1.220 -0.032 1.49 117.01 60.42 212.86 54.30 1.9 ALP1 0.0343966 0.239 0.374 -0.148 0.33 123.68 114.10 200.71 135.22 0.41 2Q1 0.0357064 0.207 0.336 0.047 0.32 12.42 75.88 48.62 158.59 0.38 Q1 0.0372185 0.217 0.348 -0.087 0.32 121.71 110.43 112.65 119.40 0.39 O1 0.0387307 0.426 0.447 0.254 0.34 10.67 64.17 186.55 99.02 0.91 NO1 0.0402686 0.768 0.967 -0.485 0.87 92.56 148.21 282.64 90.13 0.63 *K1 0.0417807 1.186 0.381 -0.623 0.49 77.80 44.47 315.55 32.94 9.7 J1 0.0432929 0.349 0.374 -0.200 0.34 149.16 80.00 220.70 121.09 0.87 OO1 0.0448308 0.372 0.532 -0.228 0.53 133.25 98.52 301.67 128.39 0.49 UPS1 0.0463430 0.149 0.439 -0.051 0.39 24.24 74.53 42.29 218.90 0.12 EPS2 0.0761773 0.503 1.111 -0.108 0.78 165.25 56.68 358.49 125.83 0.21 MU2 0.0776895 0.738 1.227 0.136 0.76 170.50 55.38 81.31 122.71 0.36 *N2 0.0789992 3.393 1.543 -0.365 0.78 177.25 13.84 214.62 27.76 4.8 *M2 0.0805114 14.561 1.667 -0.729 0.85 177.90 3.44 267.41 5.79 76 L2 0.0820236 1.034 1.213 -0.114 0.75 164.96 37.19 344.42 77.93 0.73 S2 0.0833333 2.119 1.577 -0.280 0.81 0.29 25.95 266.94 52.74 1.8 ETA2 0.0850736 0.514 1.031 -0.134 0.71 20.06 62.28 182.15 155.94 0.25 MO3 0.1192421 0.238 0.322 -0.126 0.24 1.77 79.93 148.75 125.55 0.55 M3 0.1207671 0.113 0.205 -0.054 0.22 141.17 98.91 198.38 145.26 0.31 MK3 0.1222921 0.207 0.244 -0.005 0.23 58.74 101.00 195.76 97.09 0.72 SK3 0.1251141 0.117 0.281 0.075 0.22 157.52 114.84 271.84 154.10 0.17 MN4 0.1595106 0.145 0.233 0.070 0.27 74.30 141.53 313.54 138.84 0.39 *M4 0.1610228 0.458 0.310 -0.110 0.37 58.89 52.42 332.49 48.14 2.2 SN4 0.1623326 0.133 0.250 -0.083 0.27 166.22 90.64 273.47 188.65 0.28 MS4 0.1638447 0.343 0.317 -0.152 0.26 156.93 57.37 70.04 88.20 1.2 S4 0.1666667 0.205 0.284 -0.027 0.26 167.10 72.76 264.03 160.65 0.52 2MK5 0.2028035 0.042 0.107 -0.005 0.11 133.33 131.60 157.88 167.94 0.16 2SK5 0.2084474 0.099 0.137 -0.011 0.13 23.14 90.34 295.11 124.94 0.52 2MN6 0.2400221 0.062 0.120 -0.031 0.10 62.32 98.97 305.10 136.19 0.26 *M6 0.2415342 0.345 0.172 -0.020 0.12 11.79 23.77 357.24 28.82 4 2MS6 0.2443561 0.106 0.126 -0.001 0.15 77.76 127.78 138.20 91.85 0.7 2SM6 0.2471781 0.132 0.144 -0.005 0.10 18.41 58.15 178.01 85.53 0.83 3MK7 0.2833149 0.079 0.099 0.009 0.09 10.78 108.17 357.58 99.23 0.63 M8 0.3220456 0.068 0.065 0.013 0.08 92.95 105.86 339.68 71.08 1.1 total var= 176.6647 pred var= 115.897 percent total var predicted/var original= 65.6 %