file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c5071.txt date: 31-Oct-2003 nobs = 3109, ngood = 3109, record length (days) = 129.54 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= -0.556, x trend= 0 var(x)= 29.0635 var(xp)= 18.0148 var(xres)= 10.9389 percent var predicted/var original= 62.0 % y0= -0.499, x trend= 0 var(y)= 9.1525 var(yp)= 4.9817 var(yres)= 4.172 percent var predicted/var original= 54.4 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 0.660 0.615 -0.249 0.40 172.55 52.21 104.93 82.32 1.2 MSF 0.0028219 0.319 0.507 -0.020 0.39 2.14 72.39 259.01 126.41 0.39 ALP1 0.0343966 0.208 0.250 -0.053 0.17 14.89 58.72 31.41 107.21 0.7 2Q1 0.0357064 0.202 0.254 0.062 0.16 164.91 63.40 3.89 103.96 0.63 Q1 0.0372185 0.136 0.202 0.012 0.17 63.37 110.99 241.12 119.40 0.46 O1 0.0387307 0.243 0.215 -0.006 0.22 45.02 68.52 92.85 78.98 1.3 NO1 0.0402686 0.261 0.407 -0.112 0.36 3.76 75.31 8.19 137.89 0.41 K1 0.0417807 0.386 0.293 -0.032 0.21 33.50 38.13 193.27 46.96 1.7 J1 0.0432929 0.242 0.227 0.077 0.18 155.85 57.40 180.01 81.59 1.1 OO1 0.0448308 0.179 0.323 -0.019 0.25 4.81 64.79 343.80 127.95 0.31 UPS1 0.0463430 0.117 0.271 0.026 0.21 132.67 83.86 23.69 145.93 0.18 EPS2 0.0761773 0.234 0.266 0.007 0.20 32.07 54.06 96.10 95.71 0.77 MU2 0.0776895 0.205 0.278 0.115 0.22 6.63 66.22 41.18 126.09 0.55 *N2 0.0789992 1.327 0.375 0.031 0.28 32.56 10.97 317.11 15.44 13 *M2 0.0805114 6.455 0.409 0.644 0.26 26.92 2.35 279.54 3.10 2.5e+002 L2 0.0820236 0.252 0.253 -0.057 0.17 161.06 46.56 125.33 78.40 0.99 *S2 0.0833333 1.120 0.370 0.046 0.27 30.35 16.56 301.68 19.46 9.2 ETA2 0.0850736 0.320 0.384 0.010 0.22 1.31 34.92 103.13 73.59 0.69 MO3 0.1192421 0.045 0.084 0.007 0.08 86.05 143.49 249.30 134.06 0.28 M3 0.1207671 0.112 0.101 -0.022 0.09 136.88 60.99 321.10 68.76 1.2 MK3 0.1222921 0.047 0.093 0.003 0.08 168.27 118.23 48.35 147.69 0.26 SK3 0.1251141 0.080 0.091 -0.028 0.09 115.88 105.98 148.78 94.92 0.78 MN4 0.1595106 0.164 0.117 -0.005 0.11 156.14 38.37 110.89 45.25 2 *M4 0.1610228 0.192 0.101 -0.009 0.11 21.61 32.96 254.72 37.99 3.6 SN4 0.1623326 0.104 0.097 0.037 0.10 152.51 63.19 176.09 77.05 1.2 MS4 0.1638447 0.052 0.080 -0.021 0.08 34.40 110.59 324.34 138.31 0.42 S4 0.1666667 0.083 0.092 -0.043 0.09 35.42 93.57 322.03 103.29 0.81 2MK5 0.2028035 0.063 0.058 -0.002 0.06 130.02 67.18 323.27 84.43 1.2 2SK5 0.2084474 0.082 0.064 0.015 0.07 23.23 63.48 104.12 72.12 1.6 *2MN6 0.2400221 0.298 0.104 0.010 0.09 40.96 17.06 280.36 17.85 8.3 *M6 0.2415342 0.458 0.090 0.108 0.08 47.02 14.66 258.54 11.62 26 *2MS6 0.2443561 0.163 0.098 -0.014 0.08 38.47 36.88 302.35 35.69 2.8 2SM6 0.2471781 0.054 0.068 -0.016 0.07 41.57 86.67 303.47 109.04 0.63 3MK7 0.2833149 0.032 0.038 -0.005 0.04 77.04 118.05 206.15 88.94 0.71 *M8 0.3220456 0.082 0.041 0.006 0.04 60.59 31.28 316.83 30.29 3.9 total var= 38.2161 pred var= 22.9965 percent total var predicted/var original= 60.2 %