file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c5691_1.txt date: 31-Oct-2003 nobs = 3180, ngood = 3179, record length (days) = 132.50 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= -0.936, x trend= 0 var(x)= 98.3815 var(xp)= 38.1796 var(xres)= 60.2676 percent var predicted/var original= 38.8 % y0= 1.6, x trend= 0 var(y)= 84.1253 var(yp)= 4.0388 var(yres)= 80.0337 percent var predicted/var original= 4.8 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 0.800 1.739 0.207 1.56 101.36 115.23 85.64 170.56 0.21 MSF 0.0028219 0.872 1.917 0.629 1.84 95.13 104.94 256.34 150.90 0.21 ALP1 0.0343966 0.385 0.601 0.116 0.67 57.31 113.80 236.65 133.93 0.41 2Q1 0.0357064 0.628 0.729 0.023 0.65 14.46 93.65 98.93 77.61 0.74 Q1 0.0372185 0.952 0.708 -0.183 0.75 23.49 52.15 8.56 51.75 1.8 O1 0.0387307 0.639 0.693 0.184 0.72 139.34 81.14 337.44 91.13 0.85 NO1 0.0402686 1.607 1.488 -0.626 1.46 74.43 76.80 87.81 78.86 1.2 *K1 0.0417807 1.436 0.685 -0.700 0.69 128.83 48.50 121.80 51.21 4.4 J1 0.0432929 0.546 0.657 -0.340 0.63 114.26 98.53 204.22 109.95 0.69 OO1 0.0448308 0.842 0.964 -0.502 0.98 90.83 96.41 36.89 119.39 0.76 UPS1 0.0463430 0.296 0.745 0.180 0.69 46.16 120.25 267.73 156.42 0.16 EPS2 0.0761773 0.398 0.815 -0.246 0.88 83.71 142.89 228.82 149.90 0.24 MU2 0.0776895 0.675 1.083 -0.263 0.86 91.24 123.17 257.30 117.80 0.39 *N2 0.0789992 2.010 1.208 0.050 1.20 19.70 37.81 290.39 42.56 2.8 *M2 0.0805114 8.442 1.450 1.302 1.23 167.15 8.20 198.43 9.20 34 L2 0.0820236 0.856 0.827 -0.199 0.88 52.41 85.66 204.40 78.20 1.1 S2 0.0833333 1.568 1.396 0.213 1.03 167.60 49.41 105.38 58.35 1.3 ETA2 0.0850736 0.930 0.959 -0.724 1.01 15.37 103.96 47.73 106.66 0.94 MO3 0.1192421 0.440 0.538 -0.152 0.54 106.66 81.91 61.83 81.25 0.67 M3 0.1207671 0.374 0.422 -0.246 0.45 89.41 109.55 197.57 118.96 0.79 *MK3 0.1222921 0.811 0.510 -0.526 0.44 65.38 77.86 308.08 78.49 2.5 SK3 0.1251141 0.307 0.440 -0.218 0.43 172.19 118.07 85.64 148.42 0.49 MN4 0.1595106 0.521 0.376 -0.147 0.38 177.83 61.36 218.65 70.72 1.9 *M4 0.1610228 0.762 0.439 -0.113 0.45 165.96 37.12 316.23 33.69 3 SN4 0.1623326 0.211 0.324 -0.014 0.30 117.31 112.99 298.66 133.02 0.42 MS4 0.1638447 0.282 0.313 0.003 0.33 150.37 97.81 226.63 94.66 0.81 S4 0.1666667 0.198 0.333 -0.095 0.33 10.37 134.76 188.71 156.86 0.35 2MK5 0.2028035 0.153 0.171 -0.073 0.17 109.16 81.88 66.94 85.63 0.8 2SK5 0.2084474 0.073 0.150 0.003 0.14 63.83 122.24 174.03 143.06 0.24 *2MN6 0.2400221 0.449 0.190 0.024 0.18 34.21 21.84 120.47 25.45 5.6 *M6 0.2415342 0.610 0.184 -0.061 0.17 41.42 17.35 261.06 17.38 11 2MS6 0.2443561 0.156 0.165 0.054 0.16 9.44 86.01 212.01 91.34 0.9 *2SM6 0.2471781 0.212 0.148 -0.065 0.16 35.59 73.60 172.00 65.94 2.1 3MK7 0.2833149 0.140 0.118 -0.019 0.11 177.72 49.61 220.23 61.61 1.4 *M8 0.3220456 0.177 0.096 -0.071 0.07 0.12 37.85 110.32 41.61 3.4 total var= 182.5067 pred var= 42.2184 percent total var predicted/var original= 23.1 %