file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c5691_5.txt date: 31-Oct-2003 nobs = 3180, ngood = 3179, record length (days) = 132.50 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= -0.936, x trend= 0 var(x)= 98.3815 var(xp)= 38.1624 var(xres)= 60.2839 percent var predicted/var original= 38.8 % y0= 1.6, x trend= 0 var(y)= 84.1253 var(yp)= 4.0297 var(yres)= 80.0432 percent var predicted/var original= 4.8 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 0.800 1.686 0.207 1.54 101.36 116.24 85.64 174.02 0.23 MSF 0.0028219 0.872 1.655 0.629 1.56 95.13 103.79 256.34 160.27 0.28 ALP1 0.0343966 0.385 0.505 0.116 0.56 57.31 94.88 236.65 137.15 0.58 2Q1 0.0357064 0.628 0.595 0.023 0.73 14.46 89.79 98.93 75.38 1.1 Q1 0.0372185 0.952 0.712 -0.183 0.77 23.49 56.10 8.56 64.22 1.8 O1 0.0387307 0.639 0.592 0.184 0.59 139.34 83.27 337.44 84.59 1.2 NO1 0.0402686 1.607 1.344 -0.626 1.50 74.43 74.51 87.81 87.49 1.4 *K1 0.0417807 1.436 0.759 -0.700 0.67 128.83 53.16 121.80 52.62 3.6 J1 0.0432929 0.546 0.672 -0.340 0.60 114.26 85.93 204.22 105.17 0.66 OO1 0.0448308 0.842 1.024 -0.502 0.85 90.83 92.98 36.89 118.89 0.68 UPS1 0.0463430 0.296 0.719 0.180 0.80 46.16 125.17 267.73 194.07 0.17 EPS2 0.0761773 0.398 0.826 -0.246 0.83 83.71 147.28 228.82 164.42 0.23 MU2 0.0776895 0.675 0.972 -0.263 0.94 91.24 124.35 257.30 109.06 0.48 *N2 0.0789992 2.010 1.369 0.050 1.14 19.70 40.67 290.39 38.02 2.2 *M2 0.0805114 8.442 1.390 1.302 1.05 167.15 9.98 198.43 10.07 37 L2 0.0820236 0.856 0.880 -0.199 0.85 52.41 84.29 204.40 85.52 0.95 S2 0.0833333 1.568 1.223 0.213 1.13 167.60 45.55 105.38 58.95 1.6 ETA2 0.0850736 0.930 1.203 -0.724 0.96 15.37 101.39 47.73 122.10 0.6 MO3 0.1192421 0.440 0.436 -0.152 0.44 106.66 85.55 61.83 93.94 1 M3 0.1207671 0.374 0.493 -0.246 0.40 89.41 107.09 197.57 109.43 0.58 *MK3 0.1222921 0.811 0.467 -0.526 0.46 65.38 78.63 308.08 79.11 3 SK3 0.1251141 0.307 0.470 -0.218 0.41 172.19 123.87 85.64 144.09 0.43 MN4 0.1595106 0.521 0.422 -0.147 0.37 177.83 71.29 218.65 64.62 1.5 *M4 0.1610228 0.762 0.425 -0.113 0.51 165.96 33.74 316.23 31.04 3.2 SN4 0.1623326 0.211 0.326 -0.014 0.28 117.31 96.05 298.66 133.02 0.42 MS4 0.1638447 0.282 0.378 0.003 0.33 150.37 99.96 226.63 104.93 0.55 S4 0.1666667 0.198 0.341 -0.095 0.30 10.37 126.04 188.71 137.30 0.34 2MK5 0.2028035 0.153 0.181 -0.073 0.21 109.16 92.08 66.94 100.51 0.72 2SK5 0.2084474 0.073 0.168 0.003 0.15 63.83 116.06 174.03 157.09 0.19 *2MN6 0.2400221 0.449 0.166 0.024 0.21 34.21 25.50 120.47 23.24 7.3 *M6 0.2415342 0.610 0.196 -0.061 0.18 41.42 17.19 261.06 17.64 9.6 2MS6 0.2443561 0.156 0.146 0.054 0.17 9.44 79.94 212.01 81.36 1.1 2SM6 0.2471781 0.212 0.160 -0.065 0.14 35.59 56.83 172.00 59.91 1.8 3MK7 0.2833149 0.140 0.123 -0.019 0.08 177.72 50.86 220.23 60.21 1.3 *M8 0.3220456 0.177 0.098 -0.071 0.09 0.12 37.98 110.32 40.25 3.3 total var= 182.5067 pred var= 42.1921 percent total var predicted/var original= 23.1 %