file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c6112.txt date: 31-Oct-2003 nobs = 2005, ngood = 2005, record length (days) = 83.54 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= -3.04, x trend= 0 var(x)= 7.9057 var(xp)= 4.8358 var(xres)= 3.0925 percent var predicted/var original= 61.2 % y0= -0.48, x trend= 0 var(y)= 24.7405 var(yp)= 12.0794 var(yres)= 12.7714 percent var predicted/var original= 48.8 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 2.165 1.803 0.066 0.39 90.58 9.22 345.30 47.89 1.4 MSF 0.0028219 0.605 1.173 -0.131 0.46 104.92 24.44 63.12 157.87 0.27 ALP1 0.0343966 0.244 0.409 0.129 0.28 93.12 56.28 308.49 137.36 0.36 2Q1 0.0357064 0.341 0.428 -0.131 0.26 107.80 52.37 357.63 106.40 0.63 Q1 0.0372185 0.173 0.370 -0.008 0.26 92.58 47.41 298.93 170.32 0.22 O1 0.0387307 0.261 0.365 -0.000 0.30 118.70 52.48 133.10 117.31 0.51 NO1 0.0402686 0.302 0.735 -0.195 0.56 115.30 61.85 201.85 185.70 0.17 K1 0.0417807 0.660 0.568 -0.030 0.30 118.09 33.01 228.03 48.10 1.3 J1 0.0432929 0.137 0.336 0.090 0.24 138.20 71.79 354.36 201.00 0.17 OO1 0.0448308 0.660 0.788 -0.186 0.43 98.55 34.61 53.85 78.40 0.7 UPS1 0.0463430 0.498 0.628 -0.146 0.35 93.06 37.19 49.66 91.68 0.63 EPS2 0.0761773 0.159 0.250 0.135 0.24 111.38 101.73 304.54 167.29 0.41 MU2 0.0776895 0.244 0.283 -0.095 0.26 113.34 64.33 8.47 106.57 0.74 *N2 0.0789992 0.969 0.342 0.111 0.27 120.10 18.78 102.15 22.95 8 *M2 0.0805114 5.368 0.349 0.895 0.34 120.86 3.14 155.00 3.89 2.4e+002 L2 0.0820236 0.336 0.322 0.017 0.21 117.41 41.76 222.03 53.02 1.1 *S2 0.0833333 1.116 0.393 0.045 0.30 131.10 16.44 111.59 20.28 8.1 ETA2 0.0850736 0.223 0.312 0.024 0.25 118.24 68.29 227.44 108.12 0.51 MO3 0.1192421 0.188 0.197 -0.008 0.14 84.25 42.16 150.59 75.32 0.91 M3 0.1207671 0.022 0.106 0.008 0.11 173.95 118.10 41.45 243.09 0.044 MK3 0.1222921 0.111 0.145 -0.066 0.12 149.80 102.17 71.08 104.42 0.59 SK3 0.1251141 0.143 0.145 0.034 0.15 141.09 73.69 36.26 102.95 0.98 MN4 0.1595106 0.112 0.130 -0.042 0.12 147.53 85.79 109.18 90.21 0.74 *M4 0.1610228 0.397 0.156 -0.168 0.15 126.72 29.76 196.45 33.74 6.5 SN4 0.1623326 0.189 0.156 -0.039 0.12 118.34 46.26 94.06 64.18 1.5 MS4 0.1638447 0.162 0.116 -0.031 0.14 172.62 86.61 70.78 58.98 1.9 S4 0.1666667 0.113 0.148 -0.049 0.11 57.86 77.17 352.48 118.02 0.58 2MK5 0.2028035 0.064 0.096 -0.016 0.09 6.97 85.37 104.64 122.09 0.44 2SK5 0.2084474 0.048 0.089 -0.027 0.09 129.29 141.94 247.11 160.71 0.29 2MN6 0.2400221 0.130 0.097 -0.001 0.10 150.25 65.99 217.77 60.68 1.8 *M6 0.2415342 0.383 0.118 0.008 0.14 148.04 19.50 287.58 16.53 11 *2MS6 0.2443561 0.204 0.114 -0.008 0.12 127.52 32.78 213.10 36.61 3.2 2SM6 0.2471781 0.046 0.083 0.017 0.10 150.91 136.48 73.71 140.41 0.31 3MK7 0.2833149 0.036 0.056 -0.025 0.06 23.79 118.84 220.88 129.52 0.4 M8 0.3220456 0.030 0.052 -0.025 0.05 55.03 118.10 16.90 136.18 0.34 total var= 32.6463 pred var= 16.9151 percent total var predicted/var original= 51.8 %