file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c6251_1.txt date: 31-Oct-2003 nobs = 3359, ngood = 3358, record length (days) = 139.96 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= -0.966, x trend= 0 var(x)= 123.0654 var(xp)= 41.742 var(xres)= 82.6064 percent var predicted/var original= 33.9 % y0= 2.47, x trend= 0 var(y)= 141.2565 var(yp)= 2.7408 var(yres)= 138.6081 percent var predicted/var original= 1.9 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 1.204 4.580 -0.694 1.96 100.95 39.87 294.80 203.65 0.069 MSF 0.0028219 1.779 3.918 -0.197 2.58 135.47 49.49 257.63 143.23 0.21 ALP1 0.0343966 0.467 0.688 -0.156 0.63 12.17 108.00 125.96 119.13 0.46 2Q1 0.0357064 0.382 0.689 -0.107 0.66 44.24 114.20 323.69 127.19 0.31 Q1 0.0372185 0.426 0.632 -0.263 0.57 132.29 114.26 347.02 127.86 0.45 O1 0.0387307 0.599 0.645 -0.226 0.70 153.62 100.80 194.72 107.08 0.86 NO1 0.0402686 1.873 1.639 -0.512 1.69 172.06 71.95 213.45 65.73 1.3 *K1 0.0417807 1.900 0.763 -0.933 0.82 143.71 40.76 139.83 41.77 6.2 J1 0.0432929 0.507 0.589 0.032 0.60 134.08 91.45 176.90 110.44 0.74 OO1 0.0448308 0.283 0.874 0.147 0.81 133.27 138.11 288.67 230.32 0.1 UPS1 0.0463430 0.866 0.779 -0.219 0.89 81.47 75.40 344.21 87.80 1.2 EPS2 0.0761773 0.819 0.943 -0.426 0.80 160.18 76.35 117.55 113.75 0.75 MU2 0.0776895 1.769 1.302 -0.998 1.04 9.95 50.25 283.54 67.15 1.8 *N2 0.0789992 2.783 1.522 -0.503 1.14 10.53 29.38 271.16 33.31 3.3 *M2 0.0805114 8.396 1.527 1.088 1.04 8.49 7.90 300.16 9.96 30 L2 0.0820236 0.722 0.817 -0.002 0.78 124.36 87.28 109.43 80.14 0.78 S2 0.0833333 1.729 1.372 -0.228 1.06 7.61 42.75 332.55 53.46 1.6 ETA2 0.0850736 0.736 0.993 -0.569 1.00 64.69 134.78 183.45 111.52 0.55 MO3 0.1192421 0.436 0.341 -0.231 0.32 106.77 87.98 217.62 75.05 1.6 M3 0.1207671 0.403 0.287 -0.124 0.33 28.04 62.26 321.97 59.77 2 MK3 0.1222921 0.490 0.372 -0.193 0.35 75.81 65.97 273.79 66.37 1.7 SK3 0.1251141 0.346 0.322 -0.053 0.37 90.35 78.92 280.79 82.10 1.2 MN4 0.1595106 0.404 0.317 -0.165 0.31 169.26 62.62 99.28 80.45 1.6 *M4 0.1610228 1.002 0.360 -0.274 0.34 4.32 22.31 317.04 26.93 7.7 SN4 0.1623326 0.112 0.266 -0.038 0.25 106.53 140.06 170.17 167.93 0.18 MS4 0.1638447 0.236 0.292 -0.019 0.27 164.97 71.02 199.03 112.05 0.65 S4 0.1666667 0.075 0.245 0.013 0.23 2.75 118.79 131.18 184.71 0.093 2MK5 0.2028035 0.115 0.162 -0.054 0.19 169.20 115.81 224.67 138.68 0.5 2SK5 0.2084474 0.106 0.156 -0.067 0.15 60.45 111.75 144.29 136.62 0.47 *2MN6 0.2400221 0.554 0.164 -0.102 0.20 41.52 21.05 296.50 24.05 11 *M6 0.2415342 0.531 0.166 0.013 0.21 59.23 21.55 351.05 23.05 10 2MS6 0.2443561 0.225 0.177 -0.052 0.19 53.95 54.38 351.39 55.67 1.6 2SM6 0.2471781 0.086 0.136 0.030 0.15 29.86 124.13 331.22 151.71 0.4 3MK7 0.2833149 0.051 0.095 0.002 0.10 50.25 123.67 126.62 146.20 0.29 M8 0.3220456 0.107 0.086 -0.005 0.08 135.71 57.79 196.64 52.90 1.6 total var= 264.3219 pred var= 44.4828 percent total var predicted/var original= 16.8 %