file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c6251_5.txt date: 31-Oct-2003 nobs = 3359, ngood = 3358, record length (days) = 139.96 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= -0.966, x trend= 0 var(x)= 123.0654 var(xp)= 42.7484 var(xres)= 80.9092 percent var predicted/var original= 34.7 % y0= 2.47, x trend= 0 var(y)= 141.2565 var(yp)= 3.3375 var(yres)= 137.9484 percent var predicted/var original= 2.4 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 1.204 3.809 -0.694 2.01 100.95 36.37 294.80 205.23 0.1 MSF 0.0028219 1.779 3.700 -0.197 2.58 135.47 41.48 257.63 184.19 0.23 ALP1 0.0343966 0.467 0.689 -0.156 0.62 12.17 102.39 125.96 121.35 0.46 2Q1 0.0357064 0.382 0.649 -0.107 0.56 44.24 101.91 323.69 130.83 0.35 Q1 0.0372185 0.426 0.624 -0.263 0.67 132.29 112.53 347.02 128.75 0.47 O1 0.0387307 0.599 0.671 -0.226 0.67 153.62 95.56 194.72 90.20 0.8 NO1 0.0402686 1.873 1.461 -0.512 1.49 172.06 71.85 213.45 73.85 1.6 *K1 0.0417807 1.900 0.786 -0.933 0.85 143.71 41.06 139.83 37.20 5.9 J1 0.0432929 0.507 0.618 0.032 0.59 134.08 89.03 176.90 97.22 0.67 OO1 0.0448308 0.283 0.814 0.147 0.75 133.27 141.86 288.67 177.52 0.12 UPS1 0.0463430 0.866 0.955 -0.219 0.77 81.47 71.71 344.21 83.50 0.82 EPS2 0.0761773 0.819 0.926 -0.426 1.03 160.18 85.81 117.55 123.50 0.78 *MU2 0.0776895 1.769 1.224 -0.998 1.09 9.95 53.43 283.54 73.97 2.1 *N2 0.0789992 2.783 1.437 -0.503 0.96 10.53 24.92 271.16 33.58 3.8 *M2 0.0805114 8.396 1.290 1.088 1.15 8.49 6.84 300.16 11.06 42 L2 0.0820236 0.722 0.854 -0.002 0.85 124.36 95.19 109.43 102.74 0.72 S2 0.0833333 1.729 1.459 -0.228 1.03 7.61 33.64 332.55 49.72 1.4 ETA2 0.0850736 0.736 0.981 -0.569 1.01 64.69 112.56 183.45 110.30 0.56 *MO3 0.1192421 0.436 0.306 -0.231 0.37 106.77 94.23 217.62 81.42 2 M3 0.1207671 0.403 0.348 -0.124 0.36 28.04 66.57 321.97 61.57 1.3 MK3 0.1222921 0.490 0.361 -0.193 0.38 75.81 58.34 273.79 53.67 1.8 SK3 0.1251141 0.346 0.385 -0.053 0.34 90.35 73.36 280.79 78.47 0.81 MN4 0.1595106 0.404 0.339 -0.165 0.30 169.26 61.06 99.28 72.73 1.4 *M4 0.1610228 1.002 0.375 -0.274 0.32 4.32 20.40 317.04 24.76 7.1 SN4 0.1623326 0.112 0.222 -0.038 0.24 106.53 130.19 170.17 161.42 0.26 MS4 0.1638447 0.236 0.287 -0.019 0.24 164.97 78.94 199.03 101.85 0.68 S4 0.1666667 0.075 0.245 0.013 0.22 2.75 106.60 131.18 189.93 0.093 2MK5 0.2028035 0.115 0.157 -0.054 0.15 169.20 100.13 224.67 121.86 0.53 2SK5 0.2084474 0.106 0.177 -0.067 0.18 60.45 121.43 144.29 125.56 0.36 *2MN6 0.2400221 0.554 0.190 -0.102 0.20 41.52 20.99 296.50 23.04 8.5 *M6 0.2415342 0.531 0.193 0.013 0.20 59.23 21.01 351.05 23.76 7.6 *2MS6 0.2443561 0.225 0.154 -0.052 0.17 53.95 64.09 351.39 60.34 2.1 2SM6 0.2471781 0.086 0.155 0.030 0.13 29.86 123.36 331.22 135.50 0.31 3MK7 0.2833149 0.051 0.097 0.002 0.10 50.25 118.07 126.62 150.43 0.28 M8 0.3220456 0.107 0.086 -0.005 0.07 135.71 51.51 196.64 57.12 1.6 total var= 264.3219 pred var= 46.0859 percent total var predicted/var original= 17.4 %