file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c6341_1.txt date: 31-Oct-2003 nobs = 3358, ngood = 3354, record length (days) = 139.92 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= 0.864, x trend= 0 var(x)= 19.6725 var(xp)= 10.8345 var(xres)= 8.8441 percent var predicted/var original= 55.1 % y0= -4.28, x trend= 0 var(y)= 70.2226 var(yp)= 16.325 var(yres)= 53.853 percent var predicted/var original= 23.2 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 1.914 2.372 0.086 0.82 94.69 21.90 306.81 89.82 0.65 MSF 0.0028219 0.707 2.171 0.160 0.86 101.91 28.57 359.23 155.51 0.11 ALP1 0.0343966 0.545 0.548 0.039 0.32 103.92 32.04 138.58 68.85 0.99 2Q1 0.0357064 0.200 0.405 -0.108 0.30 82.33 51.56 277.89 147.29 0.24 Q1 0.0372185 0.370 0.577 -0.005 0.29 96.58 43.87 342.50 110.07 0.41 O1 0.0387307 0.592 0.572 -0.031 0.39 62.70 35.62 219.17 59.25 1.1 NO1 0.0402686 0.097 0.782 -0.008 0.54 95.22 54.05 57.02 256.29 0.015 K1 0.0417807 0.763 0.613 0.054 0.27 85.34 23.20 190.45 56.48 1.5 J1 0.0432929 0.178 0.374 0.057 0.30 124.47 67.33 100.92 177.83 0.23 OO1 0.0448308 0.547 0.713 -0.214 0.47 98.66 50.34 38.92 117.49 0.59 UPS1 0.0463430 0.236 0.584 0.024 0.39 70.65 47.00 179.82 161.54 0.16 EPS2 0.0761773 0.229 0.191 -0.115 0.26 176.96 109.76 303.87 88.31 1.4 MU2 0.0776895 0.243 0.266 0.086 0.20 101.43 76.62 41.80 94.69 0.83 *N2 0.0789992 1.759 0.336 0.133 0.32 53.68 8.69 331.61 10.20 27 *M2 0.0805114 6.610 0.305 1.497 0.28 50.65 2.86 330.62 2.92 4.7e+002 *L2 0.0820236 0.404 0.266 -0.032 0.22 71.61 31.35 333.92 43.03 2.3 *S2 0.0833333 1.024 0.330 0.362 0.32 40.74 22.28 179.61 20.77 9.6 ETA2 0.0850736 0.253 0.255 -0.025 0.22 96.47 49.96 307.33 79.44 0.99 MO3 0.1192421 0.042 0.112 0.000 0.09 95.37 112.41 286.36 204.13 0.14 M3 0.1207671 0.129 0.134 0.055 0.12 126.16 78.46 290.80 86.12 0.92 MK3 0.1222921 0.102 0.122 -0.047 0.13 14.55 106.44 274.98 106.26 0.7 SK3 0.1251141 0.190 0.138 -0.181 0.13 21.22 126.12 204.66 136.39 1.9 MN4 0.1595106 0.153 0.117 0.014 0.12 119.54 53.03 21.46 49.62 1.7 *M4 0.1610228 0.267 0.153 0.086 0.11 70.00 30.63 325.98 32.82 3 *SN4 0.1623326 0.157 0.100 0.046 0.12 133.35 52.25 20.67 57.97 2.5 MS4 0.1638447 0.142 0.119 -0.088 0.10 103.10 88.87 184.66 92.05 1.4 S4 0.1666667 0.074 0.097 0.016 0.10 123.79 93.39 194.61 111.61 0.57 2MK5 0.2028035 0.055 0.079 -0.013 0.08 170.48 128.12 107.54 116.06 0.49 2SK5 0.2084474 0.058 0.074 -0.012 0.08 155.92 106.84 229.88 116.14 0.61 *2MN6 0.2400221 0.503 0.179 -0.067 0.11 84.22 11.73 359.37 21.28 7.9 *M6 0.2415342 0.974 0.189 -0.064 0.11 85.45 5.88 9.98 10.70 27 *2MS6 0.2443561 0.356 0.169 -0.046 0.10 91.19 17.03 247.51 29.83 4.4 2SM6 0.2471781 0.065 0.119 0.012 0.10 179.11 157.61 139.80 112.97 0.3 3MK7 0.2833149 0.046 0.073 0.011 0.08 92.52 112.44 134.50 128.44 0.39 M8 0.3220456 0.029 0.070 -0.001 0.07 173.78 130.74 209.83 144.87 0.17 total var= 89.8951 pred var= 27.1595 percent total var predicted/var original= 30.2 %