file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c6451_5.txt date: 31-Oct-2003 nobs = 3672, ngood = 3628, record length (days) = 153.00 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= -1.54, x trend= 0 var(x)= 93.0685 var(xp)= 41.9871 var(xres)= 51.065 percent var predicted/var original= 45.1 % y0= -0.353, x trend= 0 var(y)= 130.2599 var(yp)= 4.7214 var(yres)= 125.618 percent var predicted/var original= 3.6 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 0.401 1.499 -0.262 1.18 152.85 72.14 291.12 241.40 0.072 MSF 0.0028219 1.667 2.069 0.559 1.33 72.89 50.69 355.27 95.42 0.65 ALP1 0.0343966 0.249 0.569 0.097 0.55 39.92 109.84 273.18 178.43 0.19 2Q1 0.0357064 0.534 0.708 0.123 0.66 126.21 78.22 76.11 102.25 0.57 Q1 0.0372185 0.435 0.609 -0.163 0.73 128.24 107.71 277.70 122.29 0.51 O1 0.0387307 0.996 0.794 -0.358 0.74 90.40 66.93 177.16 79.46 1.6 NO1 0.0402686 1.380 1.838 -0.752 1.45 68.41 80.40 63.88 111.91 0.56 *K1 0.0417807 1.728 1.010 0.357 0.76 106.74 31.26 108.07 36.23 2.9 J1 0.0432929 0.520 0.750 0.110 0.70 65.32 77.09 92.34 115.22 0.48 OO1 0.0448308 0.406 0.958 0.023 0.92 160.12 128.53 170.01 137.68 0.18 UPS1 0.0463430 0.466 0.845 -0.183 0.75 154.20 128.90 250.69 145.58 0.3 EPS2 0.0761773 0.295 0.849 -0.089 0.80 102.74 116.27 259.86 195.46 0.12 MU2 0.0776895 0.717 1.020 0.105 0.88 45.14 107.89 182.45 122.29 0.49 *N2 0.0789992 2.003 1.179 0.120 1.43 2.31 44.03 94.22 37.11 2.9 *M2 0.0805114 8.444 1.207 -1.700 1.40 174.42 10.08 1.62 8.58 49 L2 0.0820236 0.492 0.761 -0.132 0.71 63.74 102.23 134.48 141.67 0.42 *S2 0.0833333 1.971 1.061 -1.276 1.26 29.02 71.53 322.69 65.98 3.5 ETA2 0.0850736 0.654 1.013 -0.010 1.11 106.85 99.85 161.77 127.01 0.42 MO3 0.1192421 0.380 0.447 -0.228 0.44 120.58 94.24 125.87 118.03 0.72 M3 0.1207671 0.355 0.414 0.129 0.42 128.65 91.90 14.82 100.79 0.74 *MK3 0.1222921 0.813 0.482 -0.010 0.50 139.06 37.57 8.23 41.45 2.8 SK3 0.1251141 0.378 0.501 0.147 0.41 108.58 64.13 210.85 101.06 0.57 MN4 0.1595106 0.433 0.391 -0.157 0.40 56.63 74.81 211.70 91.31 1.2 M4 0.1610228 0.570 0.475 -0.160 0.49 70.44 58.83 21.87 59.20 1.4 SN4 0.1623326 0.234 0.346 0.150 0.37 121.29 105.79 235.72 167.92 0.46 MS4 0.1638447 0.645 0.511 0.056 0.42 106.44 42.90 209.14 51.41 1.6 S4 0.1666667 0.305 0.430 0.159 0.45 130.13 103.55 98.65 118.27 0.5 *2MK5 0.2028035 0.700 0.346 -0.042 0.23 93.75 18.69 232.62 29.01 4.1 2SK5 0.2084474 0.123 0.235 -0.093 0.21 135.52 109.14 98.33 135.14 0.28 *2MN6 0.2400221 0.355 0.226 0.063 0.27 169.95 55.05 47.72 48.58 2.5 *M6 0.2415342 0.578 0.223 0.282 0.27 21.74 41.32 10.26 31.88 6.7 2MS6 0.2443561 0.108 0.204 0.043 0.20 35.50 107.71 173.87 135.72 0.28 2SM6 0.2471781 0.110 0.221 0.088 0.18 158.99 121.39 244.70 149.08 0.25 3MK7 0.2833149 0.228 0.178 -0.047 0.21 49.16 58.10 121.22 55.48 1.7 *M8 0.3220456 0.237 0.151 0.043 0.11 72.46 33.82 353.63 48.40 2.5 total var= 223.3284 pred var= 46.7085 percent total var predicted/var original= 20.9 %