file name: C:\SCHTUFF\MASS_BAY\MBLT_REPORT\PLOTS\c6901_1.txt date: 31-Oct-2003 nobs = 3693, ngood = 3691, record length (days) = 153.88 start time: 09-May-2000 18:39:25 rayleigh criterion = 1.0 Greenwich phase computed with nodal corrections applied to amplitude \n and phase relative to center time x0= -0.633, x trend= 0 var(x)= 117.8707 var(xp)= 48.7161 var(xres)= 68.4047 percent var predicted/var original= 41.3 % y0= 1.77, x trend= 0 var(y)= 109.7827 var(yp)= 2.3906 var(yres)= 107.4076 percent var predicted/var original= 2.2 % ellipse parameters with 95%% CI estimates tide freq major emaj minor emin inc einc pha epha snr MM 0.0015122 3.018 3.850 0.367 1.95 89.63 37.07 118.75 73.90 0.61 MSF 0.0028219 2.992 3.391 0.399 2.12 122.39 54.36 278.33 80.68 0.78 ALP1 0.0343966 0.411 0.615 -0.118 0.53 63.62 102.73 199.57 134.69 0.45 2Q1 0.0357064 0.568 0.664 -0.440 0.68 126.14 127.72 179.08 136.63 0.73 Q1 0.0372185 0.382 0.629 0.095 0.57 167.24 116.37 321.78 130.22 0.37 *O1 0.0387307 1.084 0.760 -0.202 0.75 166.91 46.62 281.58 45.76 2 NO1 0.0402686 1.845 1.636 -0.557 1.52 63.66 59.27 10.16 65.83 1.3 *K1 0.0417807 1.921 0.874 -0.795 0.79 147.16 32.16 127.94 33.31 4.8 J1 0.0432929 0.868 0.747 -0.403 0.72 92.61 78.66 164.69 65.77 1.4 OO1 0.0448308 1.111 1.090 -0.318 1.08 110.51 69.92 42.05 71.20 1 UPS1 0.0463430 0.380 0.695 0.021 0.71 0.08 115.52 231.07 146.08 0.3 EPS2 0.0761773 0.860 1.088 -0.156 0.86 16.10 83.63 50.74 96.82 0.62 MU2 0.0776895 0.962 1.114 -0.675 0.98 1.45 106.67 161.18 109.09 0.74 *N2 0.0789992 2.523 1.407 -0.448 1.08 12.70 26.91 301.81 35.02 3.2 *M2 0.0805114 8.998 1.416 0.600 1.20 6.03 7.68 1.67 10.13 40 L2 0.0820236 1.156 0.998 -0.578 0.98 159.55 65.96 139.83 80.47 1.3 *S2 0.0833333 1.702 1.159 -0.698 1.18 173.28 59.26 122.98 81.98 2.2 ETA2 0.0850736 0.488 0.933 -0.281 1.03 27.22 117.30 180.72 143.50 0.27 MO3 0.1192421 0.194 0.328 -0.002 0.31 76.55 123.80 338.62 138.34 0.35 M3 0.1207671 0.141 0.284 0.072 0.33 89.05 129.14 234.38 142.95 0.24 *MK3 0.1222921 0.621 0.361 -0.537 0.38 53.10 116.41 327.38 108.43 3 SK3 0.1251141 0.251 0.320 -0.076 0.30 111.95 108.75 57.74 105.73 0.61 MN4 0.1595106 0.402 0.346 0.006 0.31 2.29 48.78 48.45 66.45 1.4 *M4 0.1610228 0.587 0.403 -0.102 0.33 16.30 36.28 80.74 40.24 2.1 SN4 0.1623326 0.252 0.303 -0.142 0.28 141.61 94.44 149.92 111.23 0.69 MS4 0.1638447 0.371 0.361 -0.154 0.31 1.98 62.88 34.31 86.95 1.1 S4 0.1666667 0.241 0.301 -0.146 0.30 80.02 116.71 346.93 127.61 0.64 2MK5 0.2028035 0.185 0.189 -0.022 0.19 25.61 73.68 59.73 100.12 0.96 2SK5 0.2084474 0.092 0.185 0.025 0.17 130.27 113.08 260.77 155.40 0.25 *2MN6 0.2400221 0.453 0.207 -0.070 0.19 51.49 28.89 107.06 23.88 4.8 *M6 0.2415342 0.756 0.201 -0.189 0.20 43.62 16.43 170.44 15.19 14 2MS6 0.2443561 0.265 0.188 0.031 0.18 48.02 44.91 145.99 42.07 2 2SM6 0.2471781 0.065 0.124 -0.038 0.13 96.71 146.01 200.98 173.72 0.27 3MK7 0.2833149 0.120 0.117 -0.046 0.11 28.39 74.05 358.78 85.10 1.1 M8 0.3220456 0.065 0.087 0.014 0.07 11.57 73.87 267.34 110.85 0.55 total var= 227.6533 pred var= 51.1067 percent total var predicted/var original= 22.4 %